The Bob Lamb Building is an industry education center with two floors that measure approximately 28,000 square feet each (not including the 37,500 cubic foot crawl space). The building itself suffered significant water damage to the main floor and crawl space during catastrophic flooding. Our team completed extensive structural drying with the use of desiccant dehumidifiers; a strategic mould remediation aided by dry ice blasting; along with the subsequent demolition and reconstruction of all affected areas. With so much going on in one space, a clear plan was in place to prevent cross-contamination.
During the reconstruction phase, we were tasked with upgrading portions of the facility with 100% success and completion to better suit the needs of the Bob Lamb services on the go forward. The project duration was approximately 5 months.